Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 70/Square Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Flooring Type |
Multi-layer Oak Engineered Flooring |
Finish |
Pre-finished(Treffert UV coated, oil-- Brushed or Smooth surface) or unfinished |
Surface coating |
7 times anti-scratch coating (accord with European standard) |
Glue |
Eco friendly and European E1 standard, No formaldehyde,No harmless |
Joint |
Tongue & Groove |
M.C |
6-9% (or as request) |
End and edge |
Square or Beveled (or as request) |
Dimension |
1205*193*14/0.6MM |
Thickness |
14MM |
Top surface wood veneer |
0.6MM |
Veneer Grade |
AB grade |
Packing |
Cartons and Pallets |
Formaldehyde Emission |
E0, European Standard |
Loading qty |
20GP≈1500m2 40GP≈2400m2 |
Payment |
T/T 30% deposit, balance before shipment |
Warranty |
2-year warranty |
Installation |
Glue, float or nail down |
1.What's the MOQ?
The MOQ of our products are 500 squre meters.
2.How can I get your samlpes?
Generally, our samples are free charge, and you can give us an express account or you can pay by collect.
3.Can you make bespoke service?
Yes, we provide bespoke service and OEM service.
4.What about the delivery time of mass production?
The delivery time acording the products, maybe about 30-45 days. And if there has stocks, maybe less days.
5.If I had never buy form China, how can i buy?
We can help you step by step, and give you some suggestions about the freight cost and forwarder.
1. Preparation:
Before starting the installation process, ensure that the subfloor is clean, flat, and dry. Remove any debris, dust, or unevenness from the surface. It is recommended to acclimate the flooring in the installation area for at least 48 hours, following the manufacturer's instructions on proper storage conditions.
2. Tools and Materials:
Gather all the necessary tools and materials for the installation process. These may include:
- Multi-layer engineered wood flooring planks.
- Underlayment material (if required).
- Moisture barrier (if necessary).
- Measuring tape and pencil.
- Handsaw or circular saw.
- Hammer and nails or pneumatic nail gun.
- Pry bar.
- Flooring adhesive (if applicable).
- Tapping block and rubber mallet.
- Spacers.
3. Layout and Planning:
Plan the layout of the flooring, taking into consideration room dimensions, doorways, and any obstructions. Mark the starting point using a chalk line or by measuring the desired distance from the wall. Consider the expansion gap requirements and use spacers to create a consistent gap along the perimeter of the room.
4. Underlayment Installation (if required):
If your flooring manufacturer recommends an underlayment, install it according to the manufacturer's instructions. Generally, this involves rolling out the underlayment material and securing it in place with adhesive or tape, ensuring that the seams are properly sealed.
5. Moisture Barrier Installation (if necessary):
If your subfloor requires a moisture barrier, such as in basements or concrete floors, install it according to the manufacturer's instructions. Typically, this involves rolling out the moisture barrier and securing it in place with adhesive or tape, ensuring that the seams are properly sealed.
6. Installation of the First Row:
Start by laying the first row of flooring along the marked starting line. Place the groove side of the first plank against the wall, leaving the recommended expansion gap. Use a pry bar or tapping block to ensure a snug fit between planks. Leave a small gap (1/4-1/2 inch) at each end of the row to allow for expansion.
7. Installation of Subsequent Rows:
Continue installing the next rows of flooring, ensuring that the tongue and groove connections are securely locked in place. Use a tapping block and rubber mallet to gently tap the planks together. Stagger the joints by at least 6 inches between adjacent rows to provide a more natural look.
8. Trimming and Fitting:
Measure and cut the last plank in each row to fit against the wall. Leave the recommended expansion gap and secure the plank using adhesive or nails, as per the manufacturer's instructions.
9. Finishing:
Once the flooring is fully installed, remove the spacers and fill any expansion gaps with a compatible wood filler. Clean the floor from any debris, dust, or adhesive residue, using a recommended flooring cleaner. Allow the floor to fully dry before moving furniture or walking on it.
It is essential to follow the manufacturer's specific installation instructions provided with the flooring material for best results.
Contact Person: Nancy Xu